Stub bogie

Stub bogie with loading capacity of 125 t is designed to transport the slabs piles with the height of up to 2,7 m with the temperature of up to 800°C from the continuous casting plants to the bays of the slab warehouses of the rolling-mill shop. The stub bogie is designed with due account of travelling along the linear or nonlinear sections. The operational cycle of the stub bogie, including the slab loading, transportation, unloading and return of the empty bogie, makes 20-25 min. The bogie may be hand and automatically (main) operated.

 

 

The bogie consists of:

 

The lining of the bogie is performed by the customer.

 

Manufacturing period: 80 days.

 