Posts for charging gas disposal

These posts are installed on the top of coke side of the coke batteries with chambers volume 30...41,6 m3 and intended for dust and gas disposal out of the coking chamber to be charged through overflow sleeve to the next chamber.The overflow sleeve is included in the complete-set of coal charging machine or installed stationary along the coke side connecting two or three posts with each other. Design execution of the posts: with hydraulic- and pneumatic sealing of the cover.

Manufacturing period: 120 days.