Products
- Coke-chemical equipment
- Equipment for mine shafts and subway tunnels
- Bulk materials handling equipment
- Reduction gearboxes
- Blast-furnace equipment
- Power plant equipment
- Steelmaking equipment
- Crushing and reduction equipment
- Equipment for rocket and space complexes
- Gas-processing and oil-refining equipment
- Ore mining and processing equipment
- Sintering and roasting equipment


Motor stub bogie
Standard series: l/c of 5 t, 10 t, 20 t, 33 t.
Motor stub bogie is designed to transport the products during the technological production cycle.
The motor stub bogie consists of: frame; wheels (driving and running); guard (front, rare, side); drive; electric equipment.
Advantages:
- frame;
- wheels (driving and running);
- guard (front, rare, side);
- drive;
- electric equipment.
Manufacturing period: 80 days.