Products
- Coke-chemical equipment
- Equipment for mine shafts and subway tunnels
- Bulk materials handling equipment
- Reduction gearboxes
- Blast-furnace equipment
- Power plant equipment
- Steelmaking equipment
- Crushing and reduction equipment
- Equipment for rocket and space complexes
- Gas-processing and oil-refining equipment
- Ore mining and processing equipment
- Sintering and roasting equipment


Oven heating fittings with the lower system of coke gas supply
These fittings include:
- reversing cocks;
- lock cocks;
- collectors;
- unit of gas supply to the vertical flue.
Manufacturing period: 180 days.