Lowering bed installation
Intended for taking the damaged doors from the coke pusher and door extracting machine, turning to the angle 1800 and lowering to the horizontal position for repair works.
Lowering beds installation consist of three types:
- lowering beds installation with single drum winch, tensioning device and rope-block system;
- lowering beds installation with doubledrum winch, tensioning device and rope-block system;
- lowering hydro-powered beds installation with hydraulic drive.
Manufacturing period: 90 days.