Products
- Coke-chemical equipment
- Equipment for mine shafts and subway tunnels
- Bulk materials handling equipment
- Reduction gearboxes
- Blast-furnace equipment
- Power plant equipment
- Steelmaking equipment
- Crushing and reduction equipment
- Equipment for rocket and space complexes
- Gas-processing and oil-refining equipment
- Ore mining and processing equipment
- Sintering and roasting equipment


Sight hole units for regenerator
Intended for supervision over the condition of the regenerators and measurement of the temperature. The sight hole units differ in design execution of the body, depending on the mounting place and diameter of the sight hole.
Manufacturing period: 60 days.