Products
- Coke-chemical equipment
- Equipment for mine shafts and subway tunnels
- Bulk materials handling equipment
- Reduction gearboxes
- Blast-furnace equipment
- Power plant equipment
- Steelmaking equipment
- Crushing and reduction equipment
- Equipment for rocket and space complexes
- Gas-processing and oil-refining equipment
- Ore mining and processing equipment
- Sintering and roasting equipment


Pass-over gas piping
Intended for connection of gas collectors on machine and coke sides of coke battery and gas disposal for further processing through direct coke gas line.
The gas line diameter 1000- 1400m is manufactured, depending on gas flow coming from the coke ovens.
The gas line consists of throttle valve, compensator, nozzle and knee.
Manufacturing period: 120 days.