Products
- Coke-chemical equipment
- Equipment for mine shafts and subway tunnels
- Bulk materials handling equipment
- Reduction gearboxes
- Blast-furnace equipment
- Power plant equipment
- Steelmaking equipment
- Crushing and reduction equipment
- Equipment for rocket and space complexes
- Gas-processing and oil-refining equipment
- Ore mining and processing equipment
- Sintering and roasting equipment


The upper sight hole units
Intended for supervision over condition of the vertical channels and measuring the temperature therein. Differ in the dimensions of sight holes.
Manufacturing period: 90 days.