Products
- Coke-chemical equipment
- Equipment for mine shafts and subway tunnels
- Bulk materials handling equipment
- Reduction gearboxes
- Blast-furnace equipment
- Power plant equipment
- Steelmaking equipment
- Crushing and reduction equipment
- Equipment for rocket and space complexes
- Gas-processing and oil-refining equipment
- Ore mining and processing equipment
- Sintering and roasting equipment

- Hot metal ladle car
- Non-self-propelled railway slag car
- Slag car with screw ladle tilting gear
- Slag ladles of 2m3 and 5m3
- Skip for transportation of burden materials
- Hopper mechanism
- Charging machine
- Furnace cooling plates
- Furnace-charging gear (cup-and-cone)
- Blast-furnace cone
- Nostril gear
- Screw dust unloader
- Rope sheave
- Tilting runner
- Gas sampling machine
- Water filter for primary mechanical purification of water
- Bypass valve
- Equalizing valve
- Slime valve
- Goggle valve
- Sectoral valve
- Gas damper
- Thermal gas shutoff
- Bleeder stack
- Cold-blast valve
- Hot-blast valve
- Fume valve
- Gas shutoff valve
- Tuyere device
- Throttle gas valve
- Throttle unit
- Valve DX2000
- Unified dampers for metallurgic mains
- Separating flapper
- Gas shutoff valve


Fume valve
Fume valve is designed to shutoff the stove from the intake of the fume pipe during the air heating as well as to withdraw the combustion products from under the stove to the chimney.
The fume valve consists of: housing, cover, plate and cooled seat.
The plate is connected with the regulator through the joint. The driven sector is hardly landed on a single axle with the regulator and is connected with the winch through the rope.
The valves may be produced either right or left according to the drive position.
Manufacturing period: 150 days.