Products
- Coke-chemical equipment
- Equipment for mine shafts and subway tunnels
- Bulk materials handling equipment
- Reduction gearboxes
- Blast-furnace equipment
- Power plant equipment
- Steelmaking equipment
- Crushing and reduction equipment
- Equipment for rocket and space complexes
- Gas-processing and oil-refining equipment
- Ore mining and processing equipment
- Sintering and roasting equipment

- Hot metal ladle car
- Non-self-propelled railway slag car
- Slag car with screw ladle tilting gear
- Slag ladles of 2m3 and 5m3
- Skip for transportation of burden materials
- Hopper mechanism
- Charging machine
- Furnace cooling plates
- Furnace-charging gear (cup-and-cone)
- Blast-furnace cone
- Nostril gear
- Screw dust unloader
- Rope sheave
- Tilting runner
- Gas sampling machine
- Water filter for primary mechanical purification of water
- Bypass valve
- Equalizing valve
- Slime valve
- Goggle valve
- Sectoral valve
- Gas damper
- Thermal gas shutoff
- Bleeder stack
- Cold-blast valve
- Hot-blast valve
- Fume valve
- Gas shutoff valve
- Tuyere device
- Throttle gas valve
- Throttle unit
- Valve DX2000
- Unified dampers for metallurgic mains
- Separating flapper
- Gas shutoff valve


Separating flapper
Separating flapper is designed to quickly shut off the flow cross-section of the mixing cold blast pipe in case the blast supply to the furnace is stopped in order to prevent the possibility of penetration of hot gases from the furnace to the cold blast pipe. The flapper may operate in the automatic control system.
The flapper has got a vertical flap and is installed at the horizontal section of blast pipe.
Left-hand and right-hand flappers depending on the drive location are produced and supplied with electric drive, brake, controller and position switches.
Manufacturing period: 120 days.