Products
- Coke-chemical equipment
- Equipment for mine shafts and subway tunnels
- Bulk materials handling equipment
- Reduction gearboxes
- Blast-furnace equipment
- Power plant equipment
- Steelmaking equipment
- Crushing and reduction equipment
- Equipment for rocket and space complexes
- Gas-processing and oil-refining equipment
- Ore mining and processing equipment
- Sintering and roasting equipment

- Hot metal ladle car
- Non-self-propelled railway slag car
- Slag car with screw ladle tilting gear
- Slag ladles of 2m3 and 5m3
- Skip for transportation of burden materials
- Hopper mechanism
- Charging machine
- Furnace cooling plates
- Furnace-charging gear (cup-and-cone)
- Blast-furnace cone
- Nostril gear
- Screw dust unloader
- Rope sheave
- Tilting runner
- Gas sampling machine
- Water filter for primary mechanical purification of water
- Bypass valve
- Equalizing valve
- Slime valve
- Goggle valve
- Sectoral valve
- Gas damper
- Thermal gas shutoff
- Bleeder stack
- Cold-blast valve
- Hot-blast valve
- Fume valve
- Gas shutoff valve
- Tuyere device
- Throttle gas valve
- Throttle unit
- Valve DX2000
- Unified dampers for metallurgic mains
- Separating flapper
- Gas shutoff valve


Furnace-charging gear (cup-and-cone)
Cup and cone are designed to perform the function of distribution and locking of batch materials and gas sealing of the blast-furnace mouth.
The cup and cone have the increased wear resistance of contact belts due to availability of carbide and chrome welding. The gas tightness is reached due to the precise geometry received in the result of accurate grinding performed on precision equipment. To stabilize the dimensions the cup and the cone are put through a special heat treatment.
Advantages: geometrical dimensions stability.
Manufacturing period: 120 days.